Command Center›Valorian

AI-Assisted JSA Review

VAL-0003Closed Out
Download PDF
This JSA is closed out and locked — no further changes can be made.
AI-Assisted JSA Review
Powered by ValorianVAL-0003
Redpine Midstream — Cedar Flats Gas Plant
Job DetailsCryo · Hand tools and barricades · Coatings · Blast and coat
Owner
Redpine Midstream
Location
Cedar Flats Gas Plant
Unit
Cryo
Service Type
Blast and coat
Equipment Worked On
Hand tools and barricades
Brief Description of Work
Blast and coat inside Cryo
Date
November 28, 2026
Site weather
72 F
clearEvening/Night Shift
Crew Roster3/3 verified
Willa AbbottCrew Leader
Employee #VAL-CL-01
Isla Ernst
Employee #VAL-CM-03
Jorge Flores
Employee #VAL-CM-04
1/1
Crew discussion
1 statement
Walk the energy and the drop zone. Crew: Barricade is up and the monitor is on.

Review

1 steps · 2 hazards · 1 from the photo · 1 considerations added by AI
Task / Hazard Assessment
Steps of TaskPotential HazardsSafe Plan of Action
1
Set the barricade and confirm isolation
Life-critical
  • Line of fire at the barricade
  • Keep the exclusion zone marked
Not matched to a step
  • From photoTrip hazard at grate opening — Grate opening inside the barricade.
List Anchor PointsNone listed
Sensitive & Critical EquipmentNone listed
Additional safety consideration· Step 1Life-critical
Stored energy on the isolated line
COMPANY STANDARD
No company standard cited
REGULATION / STANDARD
Control of hazardous energy
Added to Crew Mitigations
Readiness check
Ready
10 checks passed

Team Member Signatures

I will work safely today and utilize the Stop Work Obligation.Trabajaré de manera segura hoy y utilizaré la Obligación de Detener el Trabajo.
Willa Abbott (lead)
Willa AbbottOct 7, 2026, 5:19 PM CDT
Isla Ernst
Isla ErnstOct 7, 2026, 5:19 PM CDT
Jorge Flores
Jorge FloresOct 7, 2026, 5:19 PM CDT
JSA Closed Out
Job Finished — Oct 8, 2026, 12:39 AM CDT. This JSA is locked and can no longer be changed.
Supervisor Certification

The signature of the supervisor certifies completion and approval of this job safety analysis.

La firma del supervisor certifica la finalización y aprobación de este análisis de seguridad del trabajo.

Assigned to Imani Solano

Imani Solano — Oct 7, 2026, 6:09 PM CDT (In person (field))