AI-Assisted JSA Review
Powered by ValorianVAL-0005
Northwind Energy — Northwind Harbor Refinery
Job DetailsCrude · Hand tools and barricades · Scaffolding · Hanging
Owner
Northwind Energy
Location
Northwind Harbor Refinery
Unit
Crude
Service Type
Hanging
General Foreman *
Not set
Start Time *
Not set
Primary Muster Point *
Not set
Secondary Muster Point
Not set
Wind Direction
Not set
Permit Type
Not set
Permit Number
Not set
Anchor Points
Not set
Equipment Worked On
Hand tools and barricades
Brief Description of Work
Hanging inside Crude
Date
November 28, 2026
Site weather
72 F
clearEvening/Night Shift
High Risk Assessment — circle all that apply
Crew Roster3/3 verified
Hugo DiazCrew Leader
Employee #VAL-CL-02
Felix Brooks
Employee #VAL-CM-01
Greta Castillo
Employee #VAL-CM-02
Work Area Visual AssessmentCOMPLETEDCOLLAPSED
1/1
Sensitive Equipment Hazard Analysis
No photos with sensitive equipment yet.
Identified items0 of 0 acknowledged
No sensitive equipment detected yet. Add anything the photos missed.
Crew discussion
1 statement
Walk the energy and the drop zone. Crew: Barricade is up and the monitor is on.
Scaffold checklist
Field Safety Assistant is listening
0/58 covered · 5 N/A
Slips, Trips and Falls
0/4
- Existing trip hazards
- Slipping when moving buggy
- Unstable/unlevel ground
- Loose material on ground
Required PPE
0/2
- Hearing protection
- Chemical goggles
Lifting with Crane
N/A
Work Regimen
0/4
- Heat stress monitoring (>70°)
- Proper liquids available
- Review heat stress symptoms
- Scheduled breaks
Pinch Points
0/5
- Handling material
- Hand/body positioning
- Racks/carts/existing structures
- Stacking boards
- Mobile equipment and structures
Heavy Lifting
0/2
- Reviewed proper technique
- Muscle strains
Overhead Work
0/3
- Falling objects
- Employee placement in chainline
- Twist method communication
Weather Conditions
0/5
- Icy
- Cool
- Windy
- Calm
- Hot
Hand Hazards
0/6
- Sharp edges
- Caught in/between
- Smashing during nailing/locking cups
- Splinters/burrs from material handling
- Knuckle busters from ratchet use
- Punctures (nails, wire, etc.)
Hand Tools (Scaffold Tools)
0/3
- General condition
- Reviewed tool safety
- Tool securing device required
Emergency Info/Equipment Location
0/2
- Safety shower
- Fire extinguisher
Fall Protection
0/3
- Anchorage points
- Self-retracting lanyard
- Double lanyard
Respiratory Protection
0/2
- Full-face
- Half-face
Coveralls
0/2
- Tyvek suit
- FRC/Nomex
Power Tools (Skilsaw)
0/4
- General condition
- Reviewed tool safety
- PPE required
- Guards in place
Process Hazards
0/5
- H2S
- Hydrocarbons
- Hot surfaces/steam
- Asbestos/PACM
- Wood/Combustible
Electrical
0/6
- Breakers locked and tagged
- Electrical cords inspected
- GFCI attached and tested
- Area conduit & lights inspected
- Assured grounding
- Other
Review
1 steps · 2 hazards · 1 from the photo · 1 considerations added by AITask / Hazard Assessment
| Steps of Task | Potential Hazards | Safe Plan of Action |
|---|---|---|
1 Set the barricade and confirm isolation Life-critical |
|
|
| Not matched to a step |
| |
| List Anchor Points | None listed | |
| Sensitive & Critical Equipment | None listed | |
Additional safety consideration· Step 1Life-critical
Stored energy on the isolated line
COMPANY STANDARD
No company standard cited
REGULATION / STANDARD
Control of hazardous energy
Added to Crew Mitigations
May have been missed
Nothing left open for the crew to resolve.
Readiness check
Ready10 checks passed
Team Member Signatures
I will work safely today and utilize the Stop Work Obligation.Trabajaré de manera segura hoy y utilizaré la Obligación de Detener el Trabajo.
Hugo Diaz (lead)
Hugo DiazOct 7, 2026, 10:19 PM CDT
Felix Brooks
Felix BrooksOct 7, 2026, 10:19 PM CDT
Greta Castillo
Greta CastilloOct 7, 2026, 10:19 PM CDT
Waiting for supervisor certification
The crew has acknowledged this JSA. Work is not authorized until the supervisor certifies it.
Supervisor Certification
The signature of the supervisor certifies completion and approval of this job safety analysis.
La firma del supervisor certifica la finalización y aprobación de este análisis de seguridad del trabajo.
Assigned to Nolan Briggs
Awaiting supervisor certification before work is authorized.
Coverage review
Read-only. What the discussion covered, plus crew resolutions.
0/0 covered · 0 N/A
Discussion captured. Next: 0 items not covered and 0 critical items to confirm
Slips, Trips and Falls
0/4
- Existing trip hazards
- Slipping when moving buggy
- Unstable/unlevel ground
- Loose material on ground
Required PPE
0/2
- Hearing protection
- Chemical goggles
Lifting with Crane
0/3
- Signalman assigned
- Taglines in use
- Area around barricaded
Work Regimen
0/4
- Heat stress monitoring (>70°)
- Proper liquids available
- Review heat stress symptoms
- Scheduled breaks
Pinch Points
0/5
- Handling material
- Hand/body positioning
- Racks/carts/existing structures
- Stacking boards
- Mobile equipment and structures
Heavy Lifting
0/2
- Reviewed proper technique
- Muscle strains
Overhead Work
0/3
- Falling objects
- Employee placement in chainline
- Twist method communication
Weather Conditions
0/7
- Wet
- Icy
- Cool
- Snow
- Windy
- Calm
- Hot
Hand Hazards
0/6
- Sharp edges
- Caught in/between
- Smashing during nailing/locking cups
- Splinters/burrs from material handling
- Knuckle busters from ratchet use
- Punctures (nails, wire, etc.)
Hand Tools (Scaffold Tools)
0/3
- General condition
- Reviewed tool safety
- Tool securing device required
Emergency Info/Equipment Location
0/2
- Safety shower
- Fire extinguisher
Fall Protection
0/3
- Anchorage points
- Self-retracting lanyard
- Double lanyard
Respiratory Protection
0/2
- Full-face
- Half-face
Coveralls
0/2
- Tyvek suit
- FRC/Nomex
Power Tools (Skilsaw)
0/4
- General condition
- Reviewed tool safety
- PPE required
- Guards in place
Process Hazards
0/5
- H2S
- Hydrocarbons
- Hot surfaces/steam
- Asbestos/PACM
- Wood/Combustible
Electrical
0/6
- Breakers locked and tagged
- Electrical cords inspected
- GFCI attached and tested
- Area conduit & lights inspected
- Assured grounding
- Other