Redpine Midstream — Cedar Flats gas plant
Job DetailsUnit 4 · Steam header · Insulation · Hot insulation
Owner
Redpine Midstream
Location
Cedar Flats gas plant
Unit
Unit 4
Service Type
Hot insulation
Equipment Worked On
Steam header
Brief Description of Work
Wrap the steam header.
Date
November 28, 2026
Site weather
91°F
Houston, TX
Moderate Humidity (59%)Heat Index 103°FWind S 15 mphEvening/Night Shift
Crew Roster3/3 verified
Isla Ernst
Employee #VAL-CM-03
Jorge Flores
Employee #VAL-CM-04
Taylor TestCrew Leader
Accepted — not in roster
Work Area Visual AssessmentCOMPLETEDCOLLAPSED
1/1
Crew discussion
1 statement
Recovered Audio
Hello? Me the talker. No. You're not supposed to shoot it at people. You're cleaning the bathroom. Please get that done. What are you working on? Okay. Well, then you're not coming to the bathroom where he's at. No. He's hungry. Oh, no. He's not. He's Excuse me?
Review
4 steps · 7 hazards · 1 from the photo · 10 considerations added by AITask / Hazard Assessment
| Steps of Task | Potential Hazards | Safe Plan of Action |
|---|---|---|
1 Job Setup and Area Preparation High |
|
|
2 Hot Surface Insulation Installation Life-critical |
|
|
3 Material Handling and Housekeeping Medium |
|
|
4 Job Close-Out and Area Restoration High |
|
|
| List Anchor Points | None listed | |
| Sensitive & Critical Equipment | None listed | |
Additional safety consideration· Step 1
Establish and mark exclusion zones around the work area to prevent uninvolved personnel from entering.
COMPANY STANDARD
No company standard cited
REGULATION / STANDARD
OSHA 29 CFR 1926.202
Not added to JSA
Additional safety consideration· Step 1High
Verify permit-to-work and hot work permit are in place and posted at the job site prior to mobilization.
COMPANY STANDARD
No company standard cited
REGULATION / STANDARD
OSHA 29 CFR 1910.119; API RP 2009
Added to Crew Mitigations
Additional safety consideration· Step 1
Conduct a formal pre-job JSA briefing covering all tasks before any insulation work begins, with sign-off from every crew member.
COMPANY STANDARD
No company standard cited
REGULATION / STANDARD
OSHA 29 CFR 1910.132; API RP 2220
Added to Crew Mitigations
Additional safety consideration· Step 2High
Verify thermal insulation materials are free of asbestos or other hazardous fibers before handling, per material data sheets.
COMPANY STANDARD
No company standard cited
REGULATION / STANDARD
OSHA 29 CFR 1910.1001
Not added to JSA
Additional safety consideration· Step 2Life-critical
Use fall protection and secure scaffolding/ladders when installing insulation at elevation on vessels or piping runs.
COMPANY STANDARD
No company standard cited
REGULATION / STANDARD
OSHA 29 CFR 1926.451
Added to Crew Mitigations
Additional safety consideration· Step 2High
Require heat-resistant gloves and long-sleeve FR clothing rated for the expected surface temperatures before contacting insulated piping.
COMPANY STANDARD
No company standard cited
REGULATION / STANDARD
OSHA 29 CFR 1910.138; NFPA 70E
Added to Crew Mitigations
Additional safety consideration· Step 3
Use proper lifting techniques or mechanical aids when moving heavy insulation jacketing or metal cladding sections.
COMPANY STANDARD
No company standard cited
REGULATION / STANDARD
OSHA General Duty Clause; ANSI Z365
Not added to JSA
Additional safety consideration· Step 3
Stage insulation materials and cladding away from walkways and secure against wind to prevent trip and struck-by hazards.
COMPANY STANDARD
No company standard cited
REGULATION / STANDARD
OSHA 29 CFR 1910.22
Added to Crew Mitigations
Additional safety consideration· Step 4
Remove all debris, tools, and waste insulation material from the work area and verify permit close-out with area operations.
COMPANY STANDARD
No company standard cited
REGULATION / STANDARD
OSHA 29 CFR 1910.119(l)
Not added to JSA
Additional safety consideration· Step 4High
Inspect completed insulation and cladding for secure fastening before demobilizing from elevated or process areas.
COMPANY STANDARD
No company standard cited
REGULATION / STANDARD
OSHA 29 CFR 1926.20
Added to Crew Mitigations
Readiness check
Ready10 checks passed
Team Member Signatures
I will work safely today and utilize the Stop Work Obligation.Trabajaré de manera segura hoy y utilizaré la Obligación de Detener el Trabajo.
Isla Ernst
Isla ErnstOct 13, 2026, 1:16 PM CDT
Jorge Flores
Jorge FloresOct 13, 2026, 1:17 PM CDT
Taylor Test (lead)
Taylor TestOct 13, 2026, 1:17 PM CDT
JSA Closed Out
Auto-Closed (Inactive) — Oct 19, 2026, 2:10 PM CDT. This JSA is locked and can no longer be changed.
Supervisor Certification
The signature of the supervisor certifies completion and approval of this job safety analysis.
La firma del supervisor certifica la finalización y aprobación de este análisis de seguridad del trabajo.
Assigned to Petra Lang
Petra Lang — Oct 13, 2026, 1:17 PM CDT (In person (field))